CONTINUOUS FUEL SUPPLY FOR A COAL GASIFICATION REACTOR
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
May 5, 2011
app pub date -
Feb 18, 2009
filing date -
Mar 5, 2008
priority date (Note) -
Abandoned
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
and a differential pressure of at least 0.5 bar so that it is possible to arrange the facility components at the same geodetic height or different geodetic heights so as to achieve a space saving and flexible plant construction. The invention also relates to a process for the continuous and uniform supply of finely ground fuel to a coal gasification reactor.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
UHDE GMBH | 44141 DORTMUND |
International Classification(s)

- 2009 Application Filing Year
- C10J Class
- 131 Applications Filed
- 79 Patents Issued To-Date
- 60.31 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Hamel, Stefan | Wenden, DE | 26 | 147 |
# of filed Patents : 26 Total Citations : 147 | |||
Kuske, Eberhard | Soest, DE | 24 | 402 |
# of filed Patents : 24 Total Citations : 402 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 27 Citation Count
- C10J Class
- 95.83 % this patent is cited more than
- 14 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
