Excavator
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Oct 14, 2010
app pub date -
Apr 13, 2010
filing date -
Apr 14, 2009
priority date (Note) -
Abandoned
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
The present invention relates to an excavator having an undercarriage, a superstructure and an internal combustion engine for the drive of the excavator arranged in or at the superstructure, with at least one fuel tank for the supply of the internal combustion engine with fuel being arranged in or/and at the undercarriage of the excavator.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
LIEBHERR-HYDRAULIKBAGGER GMBH | 88457 KIRCHDORF/ILLER |
International Classification(s)

- 2010 Application Filing Year
- B60K Class
- 896 Applications Filed
- 658 Patents Issued To-Date
- 73.44 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Bolz, Gerhard | Kirchdorf an der Iller, DE | 9 | 60 |
# of filed Patents : 9 Total Citations : 60 | |||
Miller, Alfred | Haslach, DE | 12 | 86 |
# of filed Patents : 12 Total Citations : 86 | |||
Niederer, Marco | Blaubeuren, DE | 1 | 9 |
# of filed Patents : 1 Total Citations : 9 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 9 Citation Count
- B60K Class
- 1.91 % this patent is cited more than
- 15 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
