METHOD OF CONTROLLING THE FORCE OF A SOLENOID, A CONTROLLABLE FORCE TRANSDUCER AND THE USE THEREOF
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Sep 30, 2010
app pub date -
Nov 30, 2006
filing date -
Dec 1, 2005
priority date (Note) -
Abandoned
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A method of controlling a solenoid for controlling the force thereof, and a controllable force transducer includes that only a small part of the maximal stroke length of the solenoid is utilized, whereby the exerted force thereof is substantially constant within said stroke-length distance, when the solenoid is fed with a constant driving power. At a constant driving voltage, the feed current can be controlled for a proportional alteration of the exerted force of the solenoid within said stroke-length distance. The controller finds favourable use in a sheet separator.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
TALARIS LIMITED | BASINGSTOKE RG24 8QZ |
International Classification(s)

- 2006 Application Filing Year
- H02K Class
- 1181 Applications Filed
- 731 Patents Issued To-Date
- 61.90 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Sundmark, Jörgen | Katrineholm, SE | 3 | 2 |
# of filed Patents : 3 Total Citations : 2 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- H02K Class
- 0 % this patent is cited more than
- 15 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
