ASSEMBLY FOR AND METHOD OF MAKING A TYRE COMPONENT
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Apr 15, 2010
app pub date -
Sep 26, 2007
filing date -
Oct 16, 2006
priority date (Note) -
Abandoned
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
Assembly (1) for making at least a part of a tyre. The assembly (1) comprises a first building unit (3) having a first building drum (4) for a first tyre component and a second building unit (1) having a second building drum (2) for a second tyre component differing from the first tyre component. The assembly further comprises transfer means (5) for transferring tyre components between the first (4) and second (2) building drum. At least one of the building drums can be placed in an operative position in which the axis of rotation of the one building drum is out of line, but parallel, with the axis of rotation of the other building drum placed in an operative position.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
VMI HOLLAND B V | 8161 RK EPE |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Slots, Antonie | Rs Heeten, NL | 15 | 39 |
# of filed Patents : 15 Total Citations : 39 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 1 Citation Count
- B29C Class
- 7.07 % this patent is cited more than
- 15 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
