Energy from subterranean reservoir fluid
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Jul 10, 2012
Issued Date -
N/A
app pub date -
Sep 29, 2008
filing date -
Sep 29, 2008
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
A system includes a collection of water at a first elevation, an aquifer at a second elevation lower than the first elevation and one or more fluid communication channels that facilitate fluid communication between the collection of water and the aquifer. A turbine-generator is in one of the fluid communication channels to convert kinetic energy of fluid that has flown out of the collection of water into electrical energy. A fluid collection area is downstream of the turbine-generator that at least temporarily collects fluid that has passed through the turbine-generator. An injection pump is provided to pump fluid that has accumulated in the collection area into the aquifer.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
RILEY WILLIAM | CAPTIVA FLORIDA 33924 |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Riley, William | New York, US | 31 | 396 |
# of filed Patents : 31 Total Citations : 396 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 10 Citation Count
- F16D Class
- 6.94 % this patent is cited more than
- 13 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
