Process for the production of a conductor track structure
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
May 14, 2009
app pub date -
Oct 22, 2008
filing date -
Oct 29, 2007
priority date (Note) -
Abandoned
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
The invention concerns a process for the production of a conductor track structure on a flexible plastic film, a conductor track structure produced in accordance therewith, wherein the conductor track structure is connected to the plastic film by means of an adhesive layer hardened by irradiation, and is formed from an electrically conducting thin film layer in pattern form, which is galvanically reinforced with at least one metal layer, as well as an electronic component or an electronic circuit having such a conductor track structure.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
LEONHARD KURZ STIFTUNG & CO KG | SCHWABACHER STRASSE 482 FÜRTH 90763 |
International Classification(s)

- 2008 Application Filing Year
- H05K Class
- 3295 Applications Filed
- 1697 Patents Issued To-Date
- 51.51 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Attner, Juri | Burgthann, DE | 14 | 224 |
# of filed Patents : 14 Total Citations : 224 | |||
Rohm, Michael | Furth, DE | 3 | 6 |
# of filed Patents : 3 Total Citations : 6 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 2 Citation Count
- H05K Class
- 1.90 % this patent is cited more than
- 16 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
