Ozone generating device
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
N/A
app pub date -
Aug 29, 2007
filing date -
Jul 3, 2007
priority date (Note) -
Abandoned
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
Devices for generating and storing ozone. A device for generating ozone includes: at least one elongated electrode unit including an outer tubular dielectric member and an inner conducting member having a longitudinal axis; and one or more elongated electrode tubes disposed circumferentially about the longitudinal axis. Each of the electrode tubes is arranged in parallel to the electrode unit. When an electrical potential is applied across the conducting member and electrode tubes during operation, plasma is established between the dielectric member and electrode tubes. The plasma converts oxygen gas into ozone gas.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
AMARANTE TECHNOLOGIES INC | 5237 APENNINES CIRCLE SAN JOSE CA 95138 |
International Classification(s)

- 2007 Application Filing Year
- C25B Class
- 240 Applications Filed
- 120 Patents Issued To-Date
- 50 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Ifland, Jeff | Cupertino , US | 4 | 16 |
# of filed Patents : 4 Total Citations : 16 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 1 Citation Count
- C25B Class
- 9.38 % this patent is cited more than
- 16 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
