Geodesic measuring instrument with a piezo drive
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Aug 16, 2011
Grant Date -
Dec 4, 2008
app pub date -
Jul 22, 2005
filing date -
Jul 22, 2004
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
In a geodesic measuring instrument with a fixing device for positioning the measuring instrument and with a measuring component having an optical beam path for surveying a target, whereby the measuring components are mounted in an aligning component that can be moved relative to the fixing device, and can be moved relative to the aligning component, an optical beam path is modified by at least one piezoelectric micromotor.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
LEICA GEOSYSTEMS AG | 9435 HEERBRUGG |
International Classification(s)

- 2005 Application Filing Year
- G01C Class
- 1090 Applications Filed
- 631 Patents Issued To-Date
- 57.89 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Bernhard, Heinz | Berneck, CH | 14 | 212 |
# of filed Patents : 14 Total Citations : 212 | |||
Häle, Anton | Widnau, CH | 1 | 4 |
# of filed Patents : 1 Total Citations : 4 | |||
Herbst, Christoph | Dornbirn, AT | 11 | 44 |
# of filed Patents : 11 Total Citations : 44 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 4 Citation Count
- G01C Class
- 3.99 % this patent is cited more than
- 14 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
