Data center life cycle management

Number of patents in Portfolio can not be more than 2000

United States of America Patent

APP PUB NO 20080281654A1
SERIAL NO

11801375

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Managing a data center life cycle of an enterprise begins with a policy defining stages of the life cycle and criteria indicating a successful evaluation of each stage. Evaluators, according to a predetermined identity, attest to whether the policy is satisfied for a single stage of the life cycle until all stages are evaluated, but advancement from one stage to the next only occurs upon the policy being satisfactorily met. If the policy is not met, corrective action is taken, including an optional step of notifying personnel of a stage failure. Documenting the attestation is another consideration as is auditing the documenting. In this manner, troubleshooting is enhanced or an historical record is achieved. In the event of multiple evaluators, each may attest to the satisfaction of a portion of the policy. Further definitions include computing configurations per a single machine and/or an entirety of the data center.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JPMORGAN CHASE BANK N A AS SUCCESSOR AGENT10 S DEARBORN FLOOR L2 CHICAGO IL 60603

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Carter, Stephen R Spanish Fork, UT 234 9248
Wipfel, Robert A Draper, UT 18 1406

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation