Three-port ethernet switch with external buffer
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Oct 2, 2008
app pub date -
Mar 30, 2007
filing date -
Mar 30, 2007
priority date (Note) -
Abandoned
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
System and method for routing data packets in an Ethernet switch. A preferred embodiment comprises receiving a data frame at a first port, wherein the data frame comprises a header portion and payload portion. The header portion is analyzed to determine a destination port for the data frame. A destination status is added to the header portion to create a modified header portion. The modified header portion is stored in an on-chip memory. The payload portion is stored in an off-chip memory. An on-chip CPU instructs a DMA controller how to route the data frame.
First Claim
all claims..Other Claims data not available
Family
- No Family data available.
- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
LANTIQ BETEILIGUNGS-GMBH & CO KG | 85579 NEUBIBERG |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Schmidt, Andreas | St. Augustin, DE | 466 | 8023 |
# of filed Patents : 466 Total Citations : 8023 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 23 Citation Count
- H04L Class
- 48.80 % this patent is cited more than
- 17 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Matter Detail

Renewals Detail
