Production process for NSAID-containing lozenges, their compositions, their medicinal use

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10328039
APP PUB NO 20080206326A1
SERIAL NO

11817716

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for producing a pharmaceutical lozenge formulation comprising the steps of: (a) providing a liquid composition comprising a salt of a non-steroidal anti-inflammatory drug (NSAID salt) and a solvent system, (b) providing a molten lozenge-forming composition, (c) mixing the liquid composition with the molten lozenge-forming composition, and, (d) forming the resulting mixture into lozenges each containing a therapeutically effective amount of said NSAID salt/NSAID mixture. The present application discloses the corresponding NSAID-containing lozenge compositions and their use for the manufacture of a medicament for treating sore throat.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RECKITT BENCKISER HEALTHCARE (UK) LIMITEDSLOUGH BERKSHIRE SL1 3UH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fanfarillo, Michael Nottingham, GB 2 0
Marshall, Paul Deddington, GB 27 615
Sawicka, Kirsty Gedling, GB 3 4
Takhar, Jasmine Nottingham, GB 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00