Separator for molten carbonate fuel cell

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8753784
APP PUB NO 20080160365A1
SERIAL NO

11966364

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed herein is a separator for a molten carbonate fuel cell, the separator including four steel sheets in which edges of the four steel sheets are joined to each other thereby providing three spaces therebetween, comprising a cathode channel, serving as a flow path of oxidant gas, formed in the first space; an anode channel, serving as a flow path of fuel gas, formed in the second space such that the anode channel is separated from the cathode channel; and a fuel gas reforming channel formed in the third space, which is located between the first space and the second space. The separator for a molten carbonate fuel cell is advantageous in that the volume of the fuel cell is decreased, and the structure thereof is simple, thus reducing the production cost thereof.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO LTD22 DOOSANVOLVO-RO SEONGSAN-GU CHANGWON-SI GYEONGSANGNAM-DO 642-792

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, In Gab Daejeon, KR 15 19
Kim, Young Bong Daejeon, KR 13 147
Kim, Young Jin Daejeon, KR 256 1933
Lee, Tae Won Daejeon, KR 101 1040
Yoon, Boo Ho Daejeon, KR 2 37

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 17, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00