Method for producing a fibre-composite material for producing fibre-composite components
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Feb 22, 2007
app pub date -
Jul 14, 2005
filing date -
Aug 21, 2004
priority date (Note) -
Abandoned
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
The invention relates to a method for producing a fiber-composite material with one or more fillers added to the resin, in addition to reinforcement fibers added to the resin/filler mixture, whereby, apart from the fibers, ground fiber material as fiber ground material is added to the resin or the resin/filler mixture. The invention also relates to a sheet molding compound with a resin matrix system and reinforcement fibers and optionally fillers, whereby the fillers are ground material of the same material of which the reinforcement fibers are also composed.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
SAERTEX GMBH & CO KG | 48369 SAERBECK |
International Classification(s)

- 2005 Application Filing Year
- B29C Class
- 1645 Applications Filed
- 803 Patents Issued To-Date
- 48.82 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Roth, Ekkehard | Winsen a.d. Luhe Deutschiand, DE | 2 | 12 |
# of filed Patents : 2 Total Citations : 12 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 5 Citation Count
- B29C Class
- 4.57 % this patent is cited more than
- 18 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
