Metal fin pipe foundation apparatus and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

APP PUB NO 20050232707A1
SERIAL NO

11071005

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed are a metal fin pipe foundation apparatus and method for airport approach lighting and method of making, using, and installing a metal fin pipe foundation for airport approach lighting. The metal fin pipe foundation (MFPF) of the present invention requires a small 16 inch diameter hole to be drilled approximately 8 feet deep. The MFPF, in one aspect, consists of 16 inch diameter schedule 30 pipe 6 feet long with two (2) 3/8 inch thick flat plate fins which are 6 feet, in length, and which are welded to the 16 inch schedule 30 pipe. A top plate 5 feet in length, 1 foot 6 inches in width, and 3/4 inch thick is attached by welding the top plate to the top of the 16 inch pipe and the top of the 3/8 inch fins. After the MFPF of the present invention is completely fabricated, it is dipped in hot galvanizing to protect the raw steel. This coating of galvanizing protects the MFPF for 75 years. The MFPF of the present invention can be fabricated off site and shipped to the airport ready for installation. The 16 inch diameter hole is drilled, which requires soil being extracted from the hole, and the soil is placed next to the drilled shaft hole to be placed back into the 16 inch diameter pipe after the MFPF is installed. The 16 inch diameter pipe is used as the junction box for housing the electrical transformer to provide power to the structure to be mounted to the top plate of the MFPF of the present invention. The MFPF then is installed by pushing it into the previous 16 inch drilled hole, which acts as a guide to keep it perfectly straight as it is being installed. The structure of the present invention can be immediately erected and ready for use within 6 hours. The present invention eliminates large excavation, removes soil by trucking, placing of reinforced rods, trucking of concrete, and placing of concrete during off hours and requires twenty-eight (28) days for curing before the foundation can be used.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
METAL FOUNDATIONS ACQUISITION LLC1965 WADDLE ROAD STATE COLLEGE PA 16803

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Reinert, Gary L SR Baden, PA 10 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation