Field bus system for controlling safety-critical processes
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Jan 15, 2004
app pub date -
Apr 29, 2003
filing date -
Oct 30, 2000
priority date (Note) -
Abandoned
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
The present invention relates to a field bus system for controlling safety-critical processes. The system has an open channel transmission medium and a plurality of bus subscribers connected to the transmission medium. The bus subscribers are configured to transmit bus messages via the transmission medium in order to communicate with each other. The system further has a defined communication protocol which predetermines rules for the transmission and reception of bus messages. The communication protocol includes an individual system identifier which is connected at least to each bus message transmitted via the open communication channel.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
PILZ GMBH & CO | FELIX-WANKEL-STR 2 73760 OSTFILDERN |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Wiegert, Alexander | Leinfelden-Echterdingen, DE | 2 | 14 |
# of filed Patents : 2 Total Citations : 14 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 10 Citation Count
- G06F Class
- 1.27 % this patent is cited more than
- 21 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
