Multiplier circuit
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Sep 26, 2002
app pub date -
Jun 4, 2001
filing date -
Jun 2, 2000
priority date (Note) -
Abandoned
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
The invention relates to methods and apparatus that selectively multiply an analog signal by zero (0), one (1), and negative one (-1) at high speeds. In one embodiment, the analog signal corresponds to an integration result of a transition from a first data bit to a second data bit in a serial data bitstream. Advantageously, the multiplier circuit is well adapted to relatively high-frequency operation by providing a balanced load to a driver circuit such that the selected multipliers of the multiplier circuit can switch in a substantially symmetrical manner. In one embodiment, the driver circuit includes a data transition identifier circuit.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
CONNECTCOM MICROSYSTEMS INC | 7545 IRVINE CENTER DRIVE SUITE 100 IRVINE CA 92618 |
International Classification(s)

- 2001 Application Filing Year
- G06G Class
- 521 Applications Filed
- 205 Patents Issued To-Date
- 39.35 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Enam, Syed K | Mission Viejo, CA | 18 | 127 |
# of filed Patents : 18 Total Citations : 127 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 4 Citation Count
- G06G Class
- 2.63 % this patent is cited more than
- 23 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
