Demand response of loads having thermal reserves

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12266934
APP PUB NO 20220352717A1
SERIAL NO

17624155

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods are described herein that improve grid performance by smoothing demand using thermal reserves. The smoothed demand can reduce peak loads as well as the ramp rate of demand that will otherwise require the use of inefficient, expensive generation sources. These improvements are tied to the selective switching on or off electrical loads that are coupled to thermal reserves, effectively using the thermal reserves as an energy storage mechanism. Historical data of past usage can be used to create load model and ensure that effects on customer comfort are minimized while still accomplishing the beneficial effects for the overall grid, which enables grid owners to both reduce their operational cost by avoiding expensive generation and improve system reliability by achieving more predictable power demand.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EATON INTELLIGENT POWER LIMITEDDUBLIN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ren, Wei Plymouth, US 122 620

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00