Modeling inverter outputs for pv systems

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12266932
SERIAL NO

18915291

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method may include receiving equipment parameters of the PV power plant including PV parameters of one or more PV arrays and inverter parameters of one or more inverters, and generating a prediction of the output of the PV power plant by generating a prediction of an output of the one or more PV arrays based on the PV parameters and environmental factors including solar irradiance and weather, selecting a first inverter response curve from a first set of inverter response curves and a second inverter response curve from a second set of inverter response curves, and generating, using the first inverter response curve, the second inverter response curve, the one or more of the environmental factors, and the prediction of the output of the one or more PV arrays, a prediction of the output of the one or more inverters.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BRIGHTNIGHT LLC515 N FLAGLER DRIVE SUITE 250 WEST PALM BEACH FL 33401

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bourne, Benjamin Calvin Davis, US 1 0
Leroy, Cédric Austin, US 2 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00