Container deployment from vehicle

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12266830
APP PUB NO 20240291004A1
SERIAL NO

18175039

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a system for deploying a container from a vehicle. The system includes a container; a reservoir configured to store a substance to be dispensed to the container; and a deployment device configured to transition the container between a deployed position and a retracted position. In the deployed position, the container is placed external to the vehicle, and in the retracted position, the container is placed internal to the vehicle. The system may further include a dispensing device connected to the reservoir and configured to dispense the substance from the reservoir to the container. Preferably, the vehicle is a fuel cell electric vehicle (FCEV) including a fuel cell stack, and the substance includes wastewater exhaust form the fuel cell stack.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HYUNDAI MOTOR COMPANY; KIA CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Christiana, Amanda Ann Arbor, US 21 300
Delker, Victoria Farmington Hills, US 3 0
Molnar, John Farmington Hills, US 11 335
Teutsch, Henry Detriot, US 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00