Die stack structure and manufacturing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12266637
APP PUB NO 20220230996A1
SERIAL NO

17715963

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A die stack structure includes an interconnection structure, a logic die, a control die, a first insulating encapsulant, a dummy die, a memory cube and a second insulating encapsulant. The logic die is electrically connected to the interconnection structure. The logic die comprises a first dielectric bonding structure. The control die is laterally separated from the logic die and electrically connected to the interconnection structure. The first insulating encapsulant laterally encapsulates the logic die and the control die. The dummy die is stacked on the logic die, the logic die is located between the interconnection structure and the dummy die, the dummy die comprises a second dielectric bonding structure, and a bonding interface is located between the first dielectric bonding structure and the second dielectric bonding structure. The memory cube is stacked on and electrically connected to the control die, wherein the control die is located between the interconnection structure and the memory cube. The second insulating encapsulant laterally encapsulates the dummy die and the memory cube.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAIWAN SEMICONDUCTOR MANUFACTURING COMPANY LTDHSIN-CHU 300-77

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Hsien-Wei Hsinchu, TW 976 9710
Chen, Jie New Taipei, TW 1059 5911
Chen, Ming-Fa Taichung, TW 524 4489
Chen, Ying-Ju Yunlin County, TW 202 1389
Yeh, Sung-Feng Taipei, TW 199 1672

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00