Method of forming a barrier layer in an interconnect structure of semiconductor device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12266567
APP PUB NO 20220254682A1
SERIAL NO

17731053

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Implementations of the present disclosure provide methods for preventing contact damage or oxidation after via/trench opening formation. In one example, the method includes forming an opening in a structure on the substrate to expose a portion of a surface of an electrically conductive feature, and bombarding a surface of a mask layer of the structure using energy species formed from a plasma to release reactive species from the mask layer, wherein the released reactive species form a barrier layer on the exposed surface of the electrically conductive feature.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TAIWAN SEMICONDUCTOR MANUFACTURING CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Hung Jui Shetou Shiang, TW 32 436
Chiu, Yi-Wei Kaohsiung, TW 145 922
Shen, Bo-Jhih Tainan, TW 8 35

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00