Plasma confinement device and method for plasma confinement

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12266452
APP PUB NO 20220367069A1
SERIAL NO

17771684

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A plasma confinement device (500), comprises a first magnet system (1) comprising a first plurality of concentrically arranged circular-loop coils (11, 12), comprising a first coil (11) arranged to carry a current in a first direction; and a second coil (12) arranged to carry a current in a second direction opposite to the first direction; and a second magnet system (2) comprising a second plurality of concentrically arranged circular-loop coils (21, 22), arranged with mirror symmetry with respect to the first magnet system (1) relative to a symmetry plane (P) located between the first magnet system (1) and the second magnet system (2), creating an annular plasma confinement area (206) at the symmetry plane (P) with a magnetic field normal to the symmetry plane (P) at the symmetry plane (P).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NOVATRON FUSION GROUP AB

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jäderberg, Jan Spånga, SE 10 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00