Systems and methods for controlling drive units of a marine vessel to enhance imaging of a marine environment

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12265391
SERIAL NO

17936541

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A propulsion control system for a marine vessel includes at least one image sensor positioned on the marine vessel and configured to image an area behind the marine vessel, and multiple drive units configured to propel the marine vessel. Each of the drive units is steerable about a vertical steering axis. The propulsion control system further includes a controller configured to receive a prompt to perform an obstacle clearance procedure, and in response to the prompt, steer at least one of the drive units about its vertical steering axis to increase visibility of the area behind the marine vessel by the at least one image sensor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BRUNSWICK CORPORATION26125 N RIVERWOODS BLVD STE 500 METTAWA IL 60045

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arbuckle, Jason S Horicon, US 68 964
George, Trevor Savoy, US 15 83
Kelly, Brennan J Champaign, US 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00