Sun protection device having plurality of voids and S-type polarizer

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12265238
APP PUB NO 20230367043A1
SERIAL NO

17809282

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A sun protection device is provided, which includes a main body and an S-type polarizer. The main body has an outer surface and an inner surface opposite to each other, and the outer surface is configured to face sunlight, and the main body has a plurality of voids disposed inside the main body, on the inner surface of the main body or a combination thereof, in which when the sunlight irradiates the outer surface of the main body, a first reflected light and a first refracted light are formed, and the first refracted light enters the main body, and when the first refracted light arrives at a surface of one of the voids facing the outer surface, a second reflected light is formed. The S-type polarizer is adjacent to the inner surface of the main body.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • PRIMAX ELECTRONICS LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shen, Wei-Ting Taipei, TW 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00