Electrical testing device with probe having portions with different cross-sectional areas

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12265100
APP PUB NO 20240288471A1
SERIAL NO

18113608

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device for testing a voltage level in an electrical terminal cavity including a testing body and a probe for contacting the electrical terminal cavity. The probe includes a tip portion having a first cross-sectional area, a base portion having a second cross-sectional area, and an intermediate portion extending from the tip portion to the base portion having a third cross-sectional area. The first cross-sectional area is smaller than the third cross-sectional area, the third cross-sectional area is smaller than the second cross-sectional area, and the intermediate portion is concentric with the tip portion and the base portion. An axis extends between a center of the tip portion, a center of the intermediate portion, a center of the base portion, and a center of the testing body. The device also includes a circuit operatively coupled with the probe to sense the voltage level in the electrical terminal cavity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SNAP-ON INCORPORATED

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gabbey, Nicholas A Mount Pleasant, US 12 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00