Apparatus comprising a first lens, a second lens, a third lens, a first optical fiber, a second optical fiber, and a spectrometer for spectral analysis

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12265029
APP PUB NO 20230258565A1
SERIAL NO

18157590

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus for spectral analysis comprises a first lens holder comprising a first lens, a second lens holder comprising a second lens, a first optical fiber, and a spectrometer. The first lens and the second lens are for receiving a scattered light beam and focusing it to a point. The first optical fiber is arranged between the first lens holder and the second lens holder. The first optical fiber receives a first light beam focused by the first lens, transmits the first light beam through, and then projects the first light beam on the second lens. The spectrometer is positioned on a side of the second lens holder opposite the first optical fiber. The second lens focuses the first light beam received from the first optical fiber and projects the first light beam onto the spectrometer so that the spectrometer can analyze the first light beam.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EZCONN CORPORATIONNEW TAIPEI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wu, Chin-Tsung New Taipei, TW 18 72

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00