Geothermal plant for extracting energy from a geothermal reservoir located below the ocean bottom

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12264851
APP PUB NO 20240085065A1
SERIAL NO

18262063

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A geothermal plant, for extracting energy from a geothermal reservoir located below the ocean bottom, includes a floating platform; a riser that extends from a well drilled into the geothermal reservoir, to the floating platform; an electrical pump having a mechanical actuation part located in a bore of the riser, and an electronic part located outside the riser, wherein the electrical pump is configured to pump a geothermal liquid from the geothermal reservoir to the floating platform; and a power plant located on the floating platform and configured to use a steam produced by the geothermal liquid to generate electrical power. The electrical pump is placed at a depth of the riser where the geothermal liquid is in a single-phase.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CGG SERVICES SAS27 AVENUE CARNOT MASSY CEDEX 91341

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bolton, Rebecca Conwy, GB 2 0
Crossley, Robert Conwy, GB 4 8
Drumm, Elisha Bridge of Weir, GB 3 0
Hardman, Jonathon LLandudno, GB 2 0
Nassir, Mohammad Calgary, CA 2 0
Williams, Mark LLandudno, GB 222 3598

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00