Downhole transmission with wellbore fluid flow passage

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12264679
APP PUB NO 20240141903A1
SERIAL NO

17976356

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electric submersible pump (ESP) assembly comprising an electric motor, a seal section disposed uphole of the electric motor, a gas separator disposed uphole of the seal section, a downhole transmission assembly disposed uphole of the gas separator, comprising a flow passage fluidically coupled to a liquid phase discharge port of the gas separator, a first drive shaft coupled to a drive shaft of the gas separator, a second drive shaft, and a transmission that mechanically couples the first drive shaft to the second drive shaft, wherein the transmission is configured to turn the second drive shaft at a slower angular speed than the angular speed of the first drive shaft, and a centrifugal pump assembly disposed uphole of the downhole transmission assembly, having a fluid inlet coupled to a fluid outlet of the downhole transmission assembly, and having a drive shaft coupled to the second drive shaft.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HALLIBURTON ENERGY SERVICES INC3000 N SAM HOUSTON PARKWAY E HOUSTON TX 77032-3219

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brown, Donn J Tulsa, US 97 732
Kopecky, Trevor Alan Tulsa, US 20 198
Sheth, Ketankumar Kantilal Tulsa, US 48 129

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00