Synergistic heat pumped thermal storage and flexible carbon capture system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12264599
APP PUB NO 20230392523A1
SERIAL NO

18034469

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power plant system is disclosed. The power plant system includes a combustor configured, a turbine configured to generate electricity, a heat exchanger and a steam turbine, a carbon capture system configured to remove at least a portion of carbon-based gasses from the flue gas downstream from the heat recovery steam generator, and a thermal storage system including a hot storage unit configured to store thermal energy at a hot temperature, the hot temperature greater than ambient temperature. The power plant is configured to operate in at least a first mode for storing thermal energy in the thermal storage system and a second mode for releasing the stored thermal energy from the thermal storage system and during the second mode, heat stored in the hot storage unit is transferred to the carbon capture system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COLORADO STATE UNIVERSITY RESEARCH FOUNDATION2537 RESEARCH BLVD SUITE 200 FORT COLLINS CO 80526

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bandhauer, Todd M Fort Collins, US 19 377
Garland, Shane Fort Collins, US 1 0
Herber, Daniel Fort Collins, US 1 0
Limb, Braden Fort Collins, US 1 0
Markey, Ethan Fort Collins, US 1 0
Quinn, Jason Fort Collins, US 12 143
Vercellino, Roberto Fort Collins, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00