Composite hydrofoil components and systems

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12263912
APP PUB NO 20220281558A1
SERIAL NO

17688461

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This disclosure extends to systems, apparatus, and methods for hydrofoil assemblies with components that may be constructed from multiple materials to achieve reduced weight and/or portion with relatively less rigidity. In one exemplary system, a planing blade has as underlying framework or first structural body including rib elements that define voids. The first structural body may be formed from a relatively stiff and rigid first material to provide strength and rigidity to the component. The voids are filled and at least a portion of the framework covered by a second relatively softer and more flexible material. The second material may cover one or more edges of the planning blade. In some embodiments, a mast member may have a structural member formed from a relatively stiff and rigid first material with at least a portion of the member covered by a second relatively softer and more flexible material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • BI THERMAL ASPEN EARTH, L.L.C.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Best, Aaron Salt Lake City, US 9 74
Lyon, Tyler Salt Lake City, US 8 77

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00