Plural bus arrangement for electrical supply in a vehicle

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12263798
APP PUB NO 20210380054A1
SERIAL NO

17331304

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electric supply system for a vehicle system includes two or more electric energy storage devices. Two or more buses each conductively couple an energy storage device with a corresponding load of plural loads. A controller controls conduction of current from one or more of the energy storage devices to one or more other buses to transfer energy to other energy storage devices or other loads. A method includes directing a first energy storage device of a first power supply assembly to supply electric current to a first bus conductively coupling the first energy storage device to one or more first loads onboard the vehicle system. The method further includes conducting the electric current from the first energy storage device to one or more second buses of one or more second power supply assemblies to recharge one or more second energy storage devices or power one or more second loads.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TRANSPORTATION IP HOLDINGS LLC901 MAIN AVENUE NORWALK CT 06851

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kumar, Ajith Kuttannair Erie, US 425 8886

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00