Power management system, power management method, and power management program

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12261443
APP PUB NO 20240235208A1
SERIAL NO

18561410

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power management system that controls a power generation facility including a photovoltaic power generation device, the power management system including: a control unit that controls load power based on a predicted generated power assuming that the generated power by the power generation facility is the predicted generated power based on a power generation capacity of the power generation facility; and an actual power generation amount information acquisition unit serving as a power generation information acquisition unit that acquires actual generated power generated by the power generation facility. The control unit temporarily changes the control method when detecting that the difference between the predicted generated power and the actual generated power is larger than a predetermined value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IHI CORPORATION1-1 TOYOSU 3-CHOME KOTO-KU TOKYO 1358710 JAPAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Konishi, Misako Tokyo, JP 4 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00