Multi-power system for providing electrical energy and method implemented by the same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12261437
SERIAL NO

18543019

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-power system for providing electrical energy includes a fuel cell unit, a lithium-ion cell unit, and a control unit. The control unit stores a power optimization data sheet that includes multiple power parameter sets, each including a first optimal power and a second optimal power. The control unit is configured to, when operating in a specific mode, select one of the power parameter sets as a selected set, control the fuel cell unit to operate at the first optimal power included in the selected set, control the lithium-ion cell unit to operate at the second optimal power included in the selected set, and control the fuel cell unit and the lithium-ion cell unit to cooperatively output electricity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AUTOMOTIVE RESEARCH & TESTING CENTERLUGANG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Chien-An Lugong, TW 216 1893
Lin, Po-Hsu Lugong, TW 15 79
Yeh, Yuan-Ching Lugong, TW 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00