Control system with multi-factor carbon emissions optimization

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12261434
APP PUB NO 20230253787A1
SERIAL NO

17668791

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system includes a first subsystem configured to produce a resource by consuming electricity, a second subsystem configured to produce the resource by consuming a fuel, and a controller. The controller is configured to determine an allocation of a predicted demand for the resource over a future time period between the first subsystem and the second subsystem based on a first carbon emissions rate associated with off-site production of the electricity and a second carbon emissions rate associated with on-site consumption of the fuel. The controller is also configured to control the first subsystem and the second subsystem to produce the resource in accordance with the allocation during the future time period.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TYCO FIRE & SECURITY GMBH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Elbsat, Mohammad N Milwaukee, US 121 2917
Wenzel, Michael J Grafton, US 213 6919

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00