Method and system for collaborative regulation of multi-component power distribution network with high proportion of distributed power sources

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12261433
APP PUB NO 20230093345A1
SERIAL NO

17729202

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and system for regulating a multi-component power distribution network with high proportion of distributed power sources. The method includes: the distribution network regulation center acquiring user voltage information; the information and optimization model, performing iterative calculation of corresponding preset control objectives for the distribution network regulation center in the optimization model by a Lagrange algorithm, simultaneously controlling errors of the control objectives in the iterative calculation process by a Proportional-Integral-Differential (PID) algorithm, for acquiring a regulation signal of a user side local load, and sending the user side's local load regulation signal to the user side; and performing iterative calculation of control objectives based on the regulation signal of the local load and the calculation part of the optimization model user side, and simultaneously controlling errors of the control objectives in the iterative calculation process by the PID controller, to regulate the local load.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHANDONG UNIVERSITYNO 27 SHAN DANA ROAD JI'NAN SHANDONG PROVINCE SHANDONG JINAN CITY SHANDONG PROVINCE 250000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
An, Molin Jinan, CN 1 0
Chen, Jian Jinan, CN 1588 23569
Han, Xueshan Jinan, CN 6 1
Lv, Tianguang Jinan, CN 3 0
Sun, Shumin Jinan, CN 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00