Semiconductor element

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12261380
APP PUB NO 20230155292A1
SERIAL NO

18156539

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor element comprising: an antenna array that is provided with a plurality of antennas each including a semiconductor layer having an electromagnetic wave gain or carrier nonlinearity with respect to a terahertz wave; and a coupling line that synchronizes adjacent antennas in the antenna array with each other at a frequency of the terahertz wave, wherein the coupling line includes a plurality of first regions connected to the adjacent antennas respectively and a second region provided between the plurality of first regions, wherein the second region has impedance different from impedance of each of the first regions, and wherein the second region has a loss larger than a loss of the individual first region at a frequency other than a resonance frequency of the antenna array.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CANON KABUSHIKI KAISHATOKYO TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kaifu, Noriyuki Tokyo, JP 152 2828
Koyama, Yasushi Kanagawa, JP 60 352

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00