Hyperdimensional computing device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12260913
APP PUB NO 20240274199A1
SERIAL NO

18166484

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hyperdimensional computing device includes a non-volatile memory cell array and a first operation circuit. The non-volatile memory cell array is coupled to a plurality of first word lines. The non-volatile memory cell array has a plurality of memory cell groups, a plurality of first memory cells of each of the memory cell groups are coupled to a same first word line of the first word lines, and the memory cell groups respectively store a plurality of data vectors. The first operation circuit receives at least one of the data vectors through bit lines and generates a bundled data vector according to the at least one of the data vectors.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MACRONIX INTERNATIONAL CO LTDNO 16 LI-HSIN RD SCIENCE-BASED INDUSTRIAL PARK HSINCHU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lin, Yu-Hsuan Taichung, TW 140 211
Tseng, Po-Hao Taichung, TW 78 89

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00