Signal input buffer for effectively calibrating offset

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12260901
APP PUB NO 20230326515A1
SERIAL NO

18099744

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A signal input buffer includes 1-st and 2-nd buffering blocks; a 1-st input switching block; a 2-nd input switching block; a 1-st output switching block; and a 2-nd output switching block. The signal input buffer buffers a reception signal pair and generates a buffered signal pair, and is capable of operation in a normal mode and a calibration mode, the reception signal pair includes an intrinsic reception signal and a complementary reception signal, the buffered signal pair includes an intrinsic buffered signal and a complementary buffered signal, and the calibration mode includes a 1-st calibration period and a 2-nd calibration period.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FIDELIX CO LTD6F HUNUS BLDG 93 BAEKHYEON-RO BUNDANG-GU SEONGNAM-SI GYEONGGI-DO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Jae Jin Gwangju-si, KR 181 1217

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00