Compact NUMA-aware locks

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12260267
APP PUB NO 20230161641A1
SERIAL NO

18052890

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A computer comprising multiple processors and non-uniform memory implements multiple threads that perform a lock operation using a shared lock structure that includes a pointer to a tail of a first-in-first-out (FIFO) queue of threads waiting to acquire the lock. To acquire the lock, a thread allocates and appends a data structure to the FIFO queue. The lock is released by selecting and notifying a waiting thread to which control is transferred, with the thread selected executing on the same processor socket as the thread controlling the lock. A secondary queue of threads is managed for threads deferred during the selection process and maintained within the data structures of the waiting threads such that no memory is required within the lock structure. If no threads executing on the same processor socket are waiting for the lock, entries in the secondary queue are transferred to the FIFO queue preserving FIFO order.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ORACLE INTERNATIONAL CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dice, David Foxboro, US 135 3708
Kogan, Alex Needham, US 70 356

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00