Throughput increase for compute engine

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12260214
SERIAL NO

17937332

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A compute channel can have multiple computational circuit blocks coupled in series to form a pipeline. The compute channel can perform a computation on an input tensor to generate an output tensor based on an instruction. When the computational does not require all of the computational circuit blocks, the throughput of the compute channel can be increased by splitting the data elements of the input tensor into multiple input data streams. The multiple input data streams are provided to respective subsets of one or more computational circuit blocks in the pipeline using bypass circuitry of the computational circuit blocks, and the computation can be performed on multiple input data streams in the respective subsets of one or more computational circuit blocks to generate multiple output data streams corresponding to the output tensor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AMAZON TECHNOLOGIES INCP O BOX 81226 SEATTLE WA 98108-1226

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Amirineni, Sundeep Cedar Park, US 36 367
Bathula, Sunil Kumar Austin, US 1 0
Diamant, Ron San Jose, US 194 981
Meyer, Paul Gilbert Jericho, US 33 110

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00