Systems and methods for remote power management of a communication infrastructure device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12259769
APP PUB NO 20230341917A1
SERIAL NO

17729791

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for automated control of a layer 2 or layer 3 communications infrastructure device connected to a first network located at a first site. The system includes a first uninterruptable power supply (UPS) at the first site configured to supply power to the layer 2 or layer 3 communications infrastructure device and powered by a first power source, and a network switch located at a core site remote from the communications infrastructure device, the network switch being communicatively connected to the first UPS. The network switch is configured to receive information indicative of a power event associated with the first power source and to send a shutdown command to the first UPS in response to detection of the power event.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAUDI ARABIAN OIL COMPANYDHAHRAM

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aljahdali, Fahad A Riyadh, SA 1 0
Amoudi, Abdulaziz A Riyadh, SA 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00