Selection of power supply for a host system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12259768
APP PUB NO 20230111694A1
SERIAL NO

17448597

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In an embodiment, a host system for selecting a power supply includes a processor, a bus interface to connect to a peripheral device, and a power controller. The power controller may be to: determine whether the processor has entered a reduced power mode; determine, via one or more bus messages, whether charging is to be performed for a battery of the peripheral device; and in response to a determination that the processor has entered the reduced power mode and that charging is not to be performed for the battery of the peripheral device, switch from a first power supply to a second power supply as an active power source of the host system. Other embodiments are described and claimed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTEL CORPORATION2200 MISSION COLLEGE BOULEVARD M/S SC4-202 SANTA CLARA CA 95052-5326

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Natarajan, Udaya El Dorado Hills, US 9 8
Nelson, Aruni P Folsom, US 8 4
Rajaraman, Kannappan Karnataka, IN 9 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00