Integrated circuit performance adaptation using workload predictions

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12259767
APP PUB NO 20240302879A1
SERIAL NO

18180778

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Performance adaptation for an integrated circuit includes receiving, by a workload prediction system of a hardware processor, telemetry data for one or more systems of the hardware processor. A workload prediction is determined by processing the telemetry data through a workload prediction model executed by a workload prediction controller of the workload prediction system. A profile is selected, from a plurality of profiles, that matches the workload prediction. The selected profile specifies one or more operating parameters for the hardware processor. The selected profile is provided to a power management controller of the hardware processor for controlling an operational characteristic of the one or more systems.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ADVANCED MICRO DEVICES INC2485 AUGUSTINE DRIVE SANTA CLARA CA 95054

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
John, Julian Daniel Austin, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00