Method and supervisory system for monitoring performance of a decision-making logic of a controller

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12259720
APP PUB NO 20220057790A1
SERIAL NO

17401146

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Performance of a decision-making logic of a controller of an industrial automation control system is monitored during field operation of the controller. A supervisory system receives operational data collected during field operation of the controller. The supervisory system performs an analysis of the operational data to assess performance of the decision-making logic, using pre-operational data generated prior to field operation of the controller and/or a performance assessment logic generated prior to field operation of the controller. The supervisory system generates an analysis output based on a result of the analysis.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI ENERGY LTDBROWN-BOVERI-STRASSE 5 ZÜRICH 8050

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Evrenosoglu, Yaman Cansin Baden, CH 3 1
Lymperopoulos, Ioannis Dietikon, CH 11 8
Marinakis, Adamantios Fislisbach, CH 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00