Structured nanoporous materials, manufacture of structured nanoporous materials and applications of structured nanoporous materials

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12259650
APP PUB NO 20210003915A1
SERIAL NO

16979367

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method is disclosed for manufacturing a structured polymeric material. In the method, a body is provided comprising a substantially homogenous precursor polymeric material. An interference pattern of electromagnetic radiation is set up within the body to form a partially cross-linked polymeric material, the interference pattern comprising maxima and minima of intensity of the electromagnetic radiation, the interference pattern thereby causing spatially differential cross linking of the precursor polymeric material to form crosslinked regions having relatively high cross linking density and non-crosslinked regions having relatively low cross linking density, the crosslinked regions and non-crosslinked regions corresponding to the maxima and minima of intensity of the electromagnetic radiation, respectively. The partially cross-linked polymeric material is then contacted with a solvent to cause expansion and crazing of at least some of the non-crosslinked regions to form a structured polymeric material containing pores.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KYOTO UNIVERSITYKYOTO-SHI KYOTO 606-8501

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ito, Masateru Kyoto, JP 42 126
Sivaniah, Easan Kyoto, JP 7 42
Yamamoto, Daisuke Kyoto, JP 196 1216

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00