Experimental multifunctional power supply processing device and experimental detection apparatus for connectors

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12259431
APP PUB NO 20240044981A1
SERIAL NO

17753623

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply processing device includes three electric control valve groups, a positive output terminal and a conversion control switch group. The conversion control switch group includes a selection switch group configured to selectively connect the current valve control components in each electric control valve group to the positive output terminal or the phase output terminal, and a connection switch group configured to connect or disconnect a current path between two electric control valve groups connected one another. In such a way, both AC experiments and DC experiments of high voltage and large capacity may be performed to the connectors without changing experimental site and experimental equipment, thereby effectively reducing the experimental cost.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GUANG'AN ELECTRICAL TESTING CENTER (GUANGDONG) CO LTDNO 68 XIHU ROAD EAST SHILONG TOWN DONGGUAN GUANGDONG 523000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Di Guangdong, CN 61 247
Fang, Yatao Guangdong, CN 1 0
Guo, Xiangrong Guangdong, CN 1 0
Li, Binhai Guangdong, CN 1 0
Lin, Zhili Guangdong, CN 13 87
Liu, Chengxu Guangdong, CN 1 0
Ma, Guifen Guangdong, CN 1 0
Pu, Yong Guangdong, CN 3 1
Yang, Renxu Guangdong, CN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00