Adjustment control device for precise measurement

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12259405
APP PUB NO 20230366911A1
SERIAL NO

18083539

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An adjustment control device for precise measurement that controls an inspection equipment for inspecting an inspected object to perform precise measurement includes a lowering control unit that lowers the inspection equipment with respect to the inspected object, a rotation control unit that is coupled to the lowering control unit and that controls the lowering control unit to rotate the inspection equipment at a predetermined angle in left and right directions when viewed from a frontal point of view, and a forward and backward control unit that is disposed above the rotation control unit and that transmit a moving force to the rotation control unit to move the inspection equipment forward or forward on the inspected object.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PAMTEK CO LTD9-22 DONGTANSANDAN 9-GIL GYEONGGI-DO HWASEONG-SI 18487

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Hee Tae Hwaseong-si, KR 15 56
Kim, Jae Woong Hwaseong-si, KR 186 664
Kim, Sung Gu Hwaseong-si, KR 5 11
Park, Jung In Hwaseong-si, KR 10 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00