Vehicle and propulsion system with hydrogen fuel system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12258907
APP PUB NO 20240183312A1
SERIAL NO

18439834

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An aircraft propulsion system in includes a compressor section, a heat addition system, and an expansion section in serial flow arrangement, wherein the heat addition system is configured to receive a flow of gaseous fuel from a fuel system, and wherein the flow of gaseous fuel is provided to the heat addition system to generate combustion gases. A lubricant system is configured to provide a flow of lubricant through the propulsion system. A hydraulic system is configured to provide a flow of hydraulic fluid to an actuator at the propulsion system. A thermal management system is configured to provide a flow of fluid in thermal communication with the lubricant system and the hydraulic system. The thermal management system comprises a turbine configured to receive the flow of fluid via a fluid circuit extended in fluid communication from the compressor section.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GENERAL ELECTRIC COMPANY1 RIVER ROAD SCHENECTADY NY 12345

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rambo, Jeffrey Douglas Mason, US 100 506

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00