Operation support system for construction machine and construction machine

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12258726
APP PUB NO 20210012163A1
SERIAL NO

17036325

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An operation support system for a construction machine includes a memory that stores a program and a processor configured to execute the program stored in the memory to perform a process. The process includes generating multiple operation patterns or multiple arrangement patterns for the construction machine such that a rating regarding a predetermined target index becomes relatively high, obtaining environmental information of the construction machine to be supported, and outputting, based on the multiple operation patterns or the multiple arrangement patterns, an operation pattern or an arrangement pattern with which the rating regarding the predetermined target index of an operation of the construction machine to be supported becomes relatively high under an environment corresponding to the obtained environmental information.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO HEAVY INDUSTRIES LTDTOKYO JAPAN TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Mengmeng Kanagawa, JP 14 20
Ogawa, Masaki Kanagawa, JP 58 977
Shinato, Ayano Kanagawa, JP 8 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00