Aluminium material and process for producing an aluminium material

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12258653
APP PUB NO 20230250512A1
SERIAL NO

18014931

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A metal matrix composite produced from a powder mixture including: a composition includes aluminium having a standard of purity of at least 95.0% and including hexagonal boron nitride, and up to 2% of the weight thereof of abherent, and up to 1% of the weight thereof of hexagonal boron nitride. A method for producing a metal matrix composite, which is produced from a powder mixture including: a composition including aluminium having a standard of purity of at least 95.0% and including hexagonal boron nitride, and up to 2% of the weight thereof of abherent, and up to 1% of the weight thereof of hexagonal boron nitride, includes comminuting the aluminium powder mechanically or by water atomisation or gas atomisation, and mixing the material components, in powder form, and processing the mixture, by primary shaping or extrusion or sintering or 3D printing, to form a bar, a semi-finished product, or a component.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KASAKEWITSCH ALLANEUBRANDENBURG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kasakewitsch, Alla Neubrandenburg, DE 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00